Skip to main content

London County Council. Architect's Department, Town Planning Division, Reconstruction Areas Group

 Organization

Found in 3 Collections and/or Records:

London County Council: Comprehensive Development Areas, 1944-c1960

 Series
Identifier: PJM/LCC/E
Scope and Contents London County Council: Comprehensive development areas consists of: City of London, (1947-1959) Stepney / Poplar, ( 1940-1961 ) Bermondsey, ( 1944-1959 ) South Bank, (1949-c1960) Elephant and Castle, (1951-c1956 ) Bunhill Fields, ( 1950s ) Lewisham Clock Tower, ( 1950s ) Woolwich, (...
Dates: 1944-c1960

Plans: CDA no 5 - Elephant and Castle, 1955

 File
Identifier: PJM/LCC/E/5.2.1
Scope and Contents

2 copy plans (76cm x 131cm and 38cm x 51cm) by the Reconstruction Areas Group of the Town Planning Division of London County Council's Architect's Department. The plans show the layout of Comprehensive Development Area no 5: Elephant and Castle. One plan shows the detailed layout of "Scheme A" at 44" to 1' scale. The other shows the same layout in a smaller scale sketch plan.

Dates: 1955

Plans: Elephant and Castle suggested block development and perspective sketches, 4 June 1951

 File
Identifier: PJM/LCC/E/5.2.3
Scope and Contents

2 copy and 1 manuscript architectural perspective drawings (53cm x 84cm) by the Reconstruction Areas Group of the Town Planning Division of London County Council's Architect's Department. The copy drawings are identical and show a number of alternative suggestions for block developments around the roundabouts at Comprehensive Development Area no 5: Elephant and Castle. These drawings are at a small scale. The manuscript drawing shows the shopping concourse at a larger scale.

Dates: 4 June 1951

Filtered By

  • Subject: City Planning X
  • Subject: England -- London -- Elephant and Castle X

Additional filters:

Subject
Architectural Drawing 1
Bermondsey (London, England) 1
City Planners 1
City Planning and Redevelopment Law 1
City of London (England) 1