Postwar Reconstruction
Found in 85 Collections and/or Records:
Other areas of Stepney / Poplar: Tidey Street, 1956
Information relating to the Tidey Street development of Stepney / Poplar, which was designated Neighbourhood Number 7, within the London County Council Comprehensive Development Area no 2: Stepney / Poplar. This consists of:
- papers and photographs, (1956)
- layout plans, ( April 1955 )
Papers, photographs and plans from Coventry City Architect's Department, 1939-1944
Papers, photographs and plans from Coventry City Architect's Department consists of:
- general papers, photographs, press-clippings and plans, 1939-1945
- photographs, press-clippings and plans concerning housing development in Coventry, c1940-1944
- personal material concerning Percy Johnson-Marshall's employment, 15 March 1941
Photographs of Stepney / Poplar: aerial views, 1937-1951
Oblique and vertical aerial black and white photographic prints of the Stepney / Poplar area of London. The vertical photographs (20cm x 24cm) were taken between 1945-1947 and are all stamped London County Council Architect's Department Town Planning Division on the reverse. The oblique photographs (max 30cm x 38cm, min 12cm x 16cm) are by Aerofilms Ltd and show the area before and after reconstruction following the aerial bombing of the area during World War II.
Photographs of Stepney / Poplar: east end before and after reconstruction, c1947-1961
Plans from Coventry City Architectural and Planning Department, 1931-1956
Plans from Coventry City Architectural and Planning Department consists of:
- The Coventry No 1 Town Planning Scheme, Map No 2, 1931
- City and Borough of Coventry, Development Plan 1951 - town map, 1951
- thematic maps of central Coventry, unknown
- Bell Green District Centre: general layout, 4 January 1956
Plans: South Bank assorted perspective drawings, c1953
Plans: Stepney / Poplar perspective drawing, April 1950
Manuscript perspective architectural drawing (29cm x 34cm) by J Newel Lewis of Norman & Dawbarn Ltd of a street corner in proposed housing development in Comprehensive Development Area no 2: Stepney / Poplar.
Redevelopment of Coventry - general material, 1939-1945
Redevelopment of Coventry - general material consists of:
- general papers, c1945
- general photographs, 1939
- press clippings and articles, 1940-1944
- plans,c1941-1943